A Luoi Hydropwer Tunnel
1. Investor: Central hydropwer Joint Stock Company
2. The site of construction: Hong Ha Commune, A Luoi District, Hue Province
3. Capacity: 170,0 MW
4. The main construction items: Supply tunnel
– Contract value: 96 billions dong.
– Construction period: 12 months