Nam Mu 2 Hydropower Project
1. Investor: Sodic Dien Bien Hydroelectric Company Limited
2. The site of construction: Muong Mun Commune – Tuan Giao District- Dien Bien Province
3. Installing capacity: 10,2 MW
4. The main construction items: Diversion intake, dam; Spillway, bridge traffic, valve house, Water intake, Sand discharge culvert, distribution station;
– Contract value: 45 billions dong
– Construction period: 22 months